Development program

Earn each
flight regime.

Start with the separation problem we can fly now. Advance only when hardware closes the next risk.

FA / PROGRAM / 001
Evidence-led gates
No calendar fiction
01 / ROADMAP

A program of
measured escalation.

The roadmap is gated by technical evidence, not promotional dates. Each block produces an operational capability and data for the next decision.

BLOCK 00

Architecture closure

Close the mass, propulsion, trajectory, thermal and economic models. Select the subsonic carrier, orbital stack and safe maritime operating range.

Current focus
BLOCK 01

Subsonic separation demonstrator

Use a modified widebody carrier and instrumented test article to validate carriage loads, release dynamics, delayed ignition and autonomous range safety.

Evidence gate 01
BLOCK 02

Small orbital service

Operate a subsonic air-launch service with a compact multistage rocket. Learn the real economics of aircraft integration, launch cadence and mobile range operations.

Evidence gate 02
BLOCK 03

Mach 2–3 reusable carrier

Introduce a purpose-built high-speed carrier without requiring a scramjet. Validate thermal cycles, inlet behavior, downrange recovery and supersonic separation.

Evidence gate 03
BLOCK 04

Mach 5 flight demonstrator

Demonstrate the full carrier flow path, shallow zoom, low-q separation and reusable descent before integrating a live orbital stage.

Evidence gate 04
BLOCK 05

Hypersonic orbital service

Pair the operational carrier with the lightest credible orbital vehicle. Scale cadence only after turnaround inspection and mission reliability are measured.

Program objective
02 / RISK

The hard parts,
named early.

A reusable hypersonic first stage is not made safe by calling it an aircraft. The program is organized around the risks that can end it.

RiskWhy it mattersClosure methodPriority
Installed propulsionNet thrust must remain positive after inlet, cooling and nozzle losses across the flight envelope.Full-flow-path ground rig, then progressive flight envelope expansion.Critical
Stage separationShock interaction or recontact can destroy both vehicles before orbital ignition.CFD, wind tunnel, captive carry, inert drop and powered separation sequence.Critical
Thermal cyclingReusable economics fail if every Mach 5 sortie demands extensive structure and inlet replacement.Representative hot-structure coupon tests and inspection-hour tracking.Critical
Orbital mass marginThe carrier only creates value if the remaining orbital stage closes with useful payload.Independent mass model with reserves and trajectory-coupled sizing.High
Recovery operationsA downrange landing may require multiple bases, crews and fuel systems.Lifecycle model based on real block-flight operations.High
Range integrationRunway departure does not remove launch corridors, hazard areas or licensing.Early regulator and maritime-range partnership.High
03 / DECISION

Optimize lifecycle cost.
Not fuel headlines.

Mach 5 is worth pursuing only if higher payload fraction outweighs development, inspection and downrange recovery cost.

MEASURE 01

Payload per sortie

Useful mass delivered to the exact target orbit after reserves—not gross mass attached to the carrier.

MEASURE 02

Inspection burden

Maintenance hours and replaced hardware after every thermal and propulsion cycle.

MEASURE 03

Mission reliability

Probability of successful deployment, carrier recovery and readiness for the next sortie.

Bring propulsion, structures,
range or orbital expertise.

Discuss a partnership